| Harbour Way Pedestrian & Bicycle Project |
1/10/2012 |
I-5. ADOPT a resolution approving the city's application for the Transportation
Development Act (TDA) Article 3 Pedestrian and Bicycle Funding for Fiscal
Year 2012-2013 and, if awarded, ACCEPT and APPROPRIATE the funds for
implementation of the Harbour Way Pedestrian and Bicycle Project -
Engineering Services Department (Edric Kwan 621-1825). |
Council Agenda |

Ohlone Greenway - Richmond Greenway Gap Closure
|
1/3/2012 |
Joel Camacho, P.E.,
Associate Civil Engineer
City of Richmond, Engineering Services
450 Civic Center Plaza
Richmond, CA 94804
510-620-5482 |
Schematic Design 11/15/2010 3 MB
City Mgr's Report 12/23/2011
Plan Set 12/14/2011 8 MB |

Bay Trail Gap Closure
Castro St to Richmond- San Rafael Bridge
The mile-long San Francisco Bay Trail gap between the Castro Street bus stop and the existing trail under the Richmond/San Rafael Bridge leading to Point Molate. |
3/24/2012 |
per TRAC: Funding has been secured to proceed with plans, permitting and construction design.
The ball started rolling in November when Caltrans and Contra Costa Transportation Authority received more than 100 emails from you as residents of western Contra Costa and Alameda counties from Hercules to Oakland, as well as from those residing in the counties of San Francisco, Marin and Solano supporting this Regional trail project.
Senator Hancock, Assembly Member Skinner, Councilman Tom Butt and Richmond City management then followed through skillfully on this strong showing of public support.
|
Click here for update with images depicting the trail route and conceptual design. |

Bay Trail Gap Closure
Castro St to Richmond- San Rafael Bridge |
12/1/2011 |
Edric Kwan
Chief Engineer
City of Richmond, Engineering Services
450 Civic Center Plaza
Richmond, CA 94804 |
Public Meeting Summary
Flyer with Maps, Aerial, & Details
Agenda
Summary tab of the alternatives (.xls file)
Current (2011) Study Alternatives
2001 Study Alternatives |
| RBPAC BIKE PLAN PAGE |
|
|
|
 |
11/1/2011
3/8/2010 - ongoing
11/19/10 - public comment period ends |
Richmond City Council approves Bicycle Master Plan and Pedestrian Plan by a vote of 5 to 2 as part of the following resolution:
I-2. (1) ADOPT a resolution adopting the Mitigated Negative Declaration for the
City of Richmond Bicycle Master Plan, City of Richmond Pedestrian Plan, Harbor Way Project and Carlson Boulevard Project, and finding the Mitigated
Negative Declaration adequate for the plans and projects as proposed in their
independent judgment; (2) APPROVE and ADOPT the City of Richmond's
Bicycle Master Plan; (3) APPROVE and ADOPT the City of Richmond's
Pedestrian Plan; and (4) APPROVE the Harbor Way and the Carlson Boulevard
Projects - Planning and Building Services Department (Richard Mitchell 620-
6706).
Kieron Slaughter, GPR
City of Richmond Planning Division
450 Civic Center Plaza, 2nd Floor
PO Box 4046 Richmond, CA. 94804
DESK: 510.620.6887
FAX: 510.620.6858
EMAIL: Kieron Slaughter
WEB: www.ci.richmond.ca.us/planning |
Oct. 2011 Bicycle Master Plan "final" draft and appendices are linked from this page on the city's website.
6/2/2011 Fehr and Peers aerial concept plan and cross section for the short-term proposal to "reunite" the east and west spans of the Richmond Greenway. Big file! Click here
|
Environmental Review
The City has entered into a contract with LSA Associates Inc. to complete the CEQA Environmental Review of the Bicycle Master Plan and Pedestrian Plan. The City and LSA have prepared an Initial Study Checklist and a Draft Mitigated Negative Declaration. |
Comments must be received by 5:00 p.m. September 19, 2011, at the following address:
Kieron Slaughter, Assistant Planner
Richmond Planning Division
450 Civic Center Plaza, 2nd Floor
Richmond, CA. 94804
|
Kieron Slaughter, Assistant Planner
City of Richmond Planning Division
450 Civic Center Plaza, 2nd Floor
PO Box 4046 Richmond, CA. 94804
DESK: 510.620.6887
FAX: 510.620.6858
EMAIL: Kieron Slaughter
WEB: www.ci.richmond.ca.us/planning
|
|
City of Richmond Pavement Management Program
Current & Upcoming Resurfacing Projects including an ovelay showing Bikeways
|
July, 2011 |
Patrick Phelan Engineering Infrastructure Administrator
Engineering Services Department
450 Civic Center Plaza
Richmond, CA 94804
Tel: 510-307-8111
http://www.ci.richmond.ca.us/engineering |
Current bikeway projects overlain on CORresurfacing projects.
Click here to download the zoomable PDF file
Click here to download the zoomable PDF of the current & upcoming resurfacing projects. |
The Draft Traffic Safety Study done by the City of Richmond's Engineering Department. |
Comment deadline March 1st, 2011 |
Steven_Tam, City of Richmond Engineering Dept. |
Click here to download a copy. |
RTP (Regional Transportation Plan) update / CALL FOR PROJECTS

|
to April 29, 2011
The Metropolitan Transportation Commission (MTC) will issue an open “Call for Projects” for the RTP on March 1, 2011, with project submittals due April 29, 2011. City staff in Richmond will be submitting projects and the Bicycle Coalition is going to ask that bike projects be included.
As of 3/14/2011, the process for applying and demonstrating cooperation between the city and NGOs is still not clear.
Possible Richmond projects:
- Richmond-Ohlone Greenway Connection ? cost: $1,560,000
- Richmond Greenway Overcrossing of tracks between Carlson and 23rd St (cost t.b.d.)?
|
Joel Camacho City of Richmond Engineering Dept. 510.620.5482 |
Contra Costa Countywide Transportation Plan
Ebbc website project description
Ebbc is prepared to support Richmond in our effort to close these crucial gaps in the regional bikeways.
|

Bay Trail Gap Closure
Castro St to Richmond- San Rafael Bridge |
ongoing |
Edric Kwan
City of Richmond Engineer |
Click here for TRAC's instructions to a self-guided tour of the project area
1/25/2011 Click here for the status report slide show presented by Questa Engineering at the public meeting
12/13/2010 Click here for the status report slide show presented to the RBPAC (large PDF) by Questa Engineering |
| Barrett Ave. bike striping project |
1/07/2009 ongoing |
Chadrick Smalley, MPA, Development Project Manager,Richmond Community Redevelopment Agency,p:510.412.2067
Kieron Slaughter, GPR, Ass't Planner
Richmond Planning Division
DESK: 510.620.6887
FAX: 510.620.6858
WEB: www.ci.richmond.ca.us/planning |
Scan of the map (Huge file)
Staff report to Planning commission 1/2010 (Large file)
Final traffic report-6/2009 (giant file) |
| Pedestrian Safety Assessment (PSA) and Pedestrian Master Plan |
Tuesday 3/22/2011 Richmond City Council Study Session
City Hall Chambers, 450 Civic Center Plaza, Richmond, 94804
12/2009 ongoing |
Nancy Baer Injury Prevention & Physical Activity Promotion Projects Contra Costa Health Services
597 Center Ave. Suite 115
Martinez, CA 94553
925-313-6837 phone
925-313-6334 fax |
12/14,2009 Draft Ped Plan focus areas
12/18/2009 Draft PSA Walk Audit Locations (BIG PDF) |
Pt. Molate Gambling Resort DEIS/DEIR
|
April 5, 2011 City Council Vote
10/23/09, 5pm - Comment deadline
Public Hearings:
8/12/09, 6pm 9/17/09, 6pm
Richmond Memorial Auditorium |
Recommended: Click TRAC's action page for suggested language and a pre-addressed e-mail link.
Lina Velasco,
Senior Planner
COR Planning Division
450 Civic Center Plaza
P.O. Box 4046
Richmond, CA 94804
|
-Informational email from TRAC
-9/3/09 letter from TRAC
-Online copy of the Draft DEIS/DEIR
-Primer on How to Make Effective Comments on an EIR (Tom Butt) |
| CCTA (Contra Cost Transportation Authority) final 2009 Countywide Transportation Plan |
6/2009 |
|
Click here to download the PDF from CCTA |
| |
9/19/2009 |
MTC library
fax:510.817.5932 or
tel: at 510.817.5836. |
Transportation 2035 Plan for the San Francisco Bay Area: Change in Motion
Online tool for learning more about projects and programs identified in Appendix 1 of the Plan at the Online Transportation 2035 Project Listings Web site |
| Richmond General Plan |
Comment deadline extended to 9/30/09 |
Lori Reese-Brown, Principal Planner, COR Planning Div.
450 Civic Center Plaza, 2nd Floor, Richmond, CA 94804
|
Circulation element PDF
Circulation maps PDF |
I-80 / San
Pablo Dam Road Interchange Improvements Project
(now $130 mill!!) |
Comment deadline 9/8/09, 5pm |
Sheryl M. Garcia, Associate Environmental Planner,
Dept of Transportation
Office of Environmental Analysis; P.O. Box 23660, Oakland, CA 94623-0660 |
Access the plan on the San Pablo city site
CCTA Site |
| Contra Costa Countywide Bicycle Pedestrian Plan |
Comment deadline 8/5/09 |
Brad Beck, Contra Costa County Transit Authority (CCTA) , 3478 Buskirk Ave. Suite 100, Pleasant Hill, CA 94523 |
CBPP page
County Network Map
RBPAC/Health Dept Comments
EBBC's Comments
Tony Sustak's Comments
|
| Marina
Way between Macdonald and Barrett Avenues Class
Two bike lane proposal |
7/7/08
currently in construction |
Joe
Light, Richmond Planning |
05-RTST01-ST05.PDF